references
- Bytové domy NITRA DIELY IV
- Bytový dom NOVÝ MARTIN
- Bytový dom Villa Koliba Bratislava
- Bytový komplex Minergo KOLIBA2 Bratislava
- Obytný súbor Jégeho alej I. a II. Bratislava
- PO Dlhé Diely BA
- Polyfunkčný objekt BORIA Drieňová ul. Bratislava
- Polyfunkčný objekt Dunajská - Lazaretská ul. Bratislava
- Rodinné domy Malinovo
- Sportovní komplex Michalovice
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersBytové domy NITRA DIELY IV
painting walls and ceilings of common areas, painting walls and ceilings flat, decorative painting, polyurethane coatings of constructional - complex realization of interiors
Realized for | From | To |
Metrostav SK a.s. Bratislava | 23/03/2011 | 18/06/2011 |
Investor | Used technology | Required guaranteed life-time period |
GRACO Airless, manually | 5 years | |
Applied coating system | ||