references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersIWK Kysuce - Kysucké Nové Mesto
coating of concrete structures, drywall, plaster, facade paints, fire coating of steel structures - complete realization of production halls
Realized for | From | To |
ZIPP BRATISLAVA s.r.o. | 07/10/2002 | 22/05/2003 |
Investor | Used technology | Required guaranteed life-time period |
IWK Kysuce - Kysucké Nové Mesto | GRACO Airless, manually | 5 years |
Applied coating system | ||