references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersOprava náterov nosných oceľových konštrukcií mosta R1 PR1bina
pre-surface treatment by blasting with an ultra-high-pressure water jet Falch 2500 bar, repair of coatings of steel structures of the R1 bridge
Realized for | From | To |
ViA PRiBiNA, a.s. | 04/10/2022 | 28/04/2023 |
Investor | Used technology | Required guaranteed life-time period |
Via PRiBiNA, a.s. | GRACO Airless, manually | 5 years |
Applied coating system | ||