references

Filter reference

Type of construction

Required guaranteed lifetime period

Used technology

Applied coating system

Cancel filters

Prístavba skladovej haly Bratislava - Rača

Painting walls, ceilings and floors of concrete construction, plasterboard, plaster - complete realization of interiors

Realized for From To
ZIPP BRATISLAVA s.r.o. 25/07/2012 31/08/2012
Investor Used technology Required guaranteed life-time period
GRACO Airless, manually 5 years
Applied coating system