references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersHypernova - 8 x
shopping centre Bratislava, Prievidza, Komárno, Ružomberok, Liptovský Mikuláš, Rimavská Sobota, Nové Zámky, Pezinok - interior / exterior
Realized for | From | To |
HYPERNOVA Ahold Slovakia | 17/09/2004 | 22/11/2004 |
Investor | Used technology | Required guaranteed life-time period |
HYPERNOVA Ahold Slovakia | GRACO Airless, Wagner, manually | 5 years |
Applied coating system | ||