references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersARBORIA PARK Trnava B04
Plaster, coats, paintings and coatings of floors, walls and ceilings of parking, flats, common and rented spaces - complete realization of interiors
Realized for | From | To |
L-Construction, s.r.o. BA | 05/07/2017 | 10/08/2018 |
Investor | Used technology | Required guaranteed life-time period |
LUCRON Development a. s. | GRACO Airless, manually | 5 years |
Applied coating system | ||