references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersAVION Shopping Center Bratislava
concrete constructions, Plaster wallboards, paint coats - complete carrying out of shopping areas
Realized for | From | To |
UNISTAV a.s., oz Bratislava | 01/02/2002 | 15/10/2002 |
Investor | Used technology | Required guaranteed life-time period |
AVION Shopping Center Bratislava | GRACO Airless, Wagner, manually | 5 years |
Applied coating system | ||