references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersBBC 1 PLUS Bratislava
Machinery gypsum plaster, painting and painting walls and ceilings, concrete construction, plasterboard, plaster - complete realization of interiors
Realized for | From | To |
DESTAV spol. s r.o. Nesluša | 06/11/2011 | 15/09/2012 |
Investor | Used technology | Required guaranteed life-time period |
CA Immobilien Anlagen AG Vienna | GRACO Airless, manually | 5 years |
Applied coating system | ||