references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersRekonštrukcia 8 mostných objektov BA-Prievoz
strength injection of cracks, rehabilitation of concrete surfaces, surface treatment, antigraffiti coatings of 8 bridge structures
Realized for | From | To |
D4R7 Construction s.r.o. | 06/07/2020 | 30/07/2021 |
Investor | Used technology | Required guaranteed life-time period |
Ministerstvo výstavby SR | GRACO Airless, manually | 5 years |
Applied coating system | ||