references

Filter reference

Type of construction

Required guaranteed lifetime period

Used technology

Applied coating system

Cancel filters

Oprava náterov nosných oceľových konštrukcií mosta R1 PR1bina

pre-surface treatment by blasting with an ultra-high-pressure water jet Falch 2500 bar, repair of coatings of steel structures of the R1 bridge

Realized for From To
ViA PRiBiNA, a.s. 04/10/2022 28/04/2023
Investor Used technology Required guaranteed life-time period
Via PRiBiNA, a.s. GRACO Airless, manually 5 years
Applied coating system