references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (20)
- Engineering works (26)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersRekonštrukcia Mlyny UK Bratislava
painting and coating the walls and ceilings of flats, common areas and tenant - complete realization of interiors
| Realized for | From | To | 
| Chemkostav a.s. Michalovce | 08/09/2014 | 16/12/2014 | 
| Investor | Used technology | Required guaranteed life-time period | 
| GRACO Airless, manually | 5 years | |
| Applied coating system | ||
|    | ||
 
    


