references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersRekonštrukcia Mlyny UK Bratislava
painting and coating the walls and ceilings of flats, common areas and tenant - complete realization of interiors
Realized for | From | To |
Chemkostav a.s. Michalovce | 08/09/2014 | 16/12/2014 |
Investor | Used technology | Required guaranteed life-time period |
GRACO Airless, manually | 5 years | |
Applied coating system | ||