references
Filter reference
Type of construction
- Shopping centers (12)
- Residential buildings (85)
- Business centres (19)
- Engineering works (25)
- Industry (23)
- Other buildings (23)
Required guaranteed lifetime period
Used technology
Applied coating system
Cancel filtersPrístavba skladovej haly Bratislava - Rača
Painting walls, ceilings and floors of concrete construction, plasterboard, plaster - complete realization of interiors
Realized for | From | To |
ZIPP BRATISLAVA s.r.o. | 25/07/2012 | 31/08/2012 |
Investor | Used technology | Required guaranteed life-time period |
GRACO Airless, manually | 5 years | |
Applied coating system | ||