Výmena poklopov a rámov v Tuneli Sitina

Filter reference

Type of construction

Required guaranteed lifetime period

Used technology

Applied coating system

Cancel filters

Výmena poklopov a rámov v Tuneli Sitina

replacement of old covers and frames for the new composite in cleaning niches of the left tunnel tube Sitina

Realized for From To
Národná diaľničná spoločnosť a.s. 21/08/2015 04/09/2015
Investor Used technology Required guaranteed life-time period
Národná diaľničná spoločnosť, a.s. Bratislava manually 2 years
Applied coating system